
Dover Logistics Center
Dover, DE

Property Overview
Dover Logistics Center is a two building, 296,400 SF Class A development project in Dover, DE located east of Route 1 off Lafferty Lane. Building 1 totals 132,600 SF and building 2 totals 163,800 SF. Construction will begin in the fall of 2022 with the first building delivering in fall of 2023.

Building Features
- Tilt-up concrete construction
- 32' clear ceiling height
- 50' x 52' column spacing
- 60' speed bay
- 130' truck court
- Parking: 599
- Building 1: 267
- Building 2: 332
- 67 dock doors per building
- 2.01/1,000 SF parking ratio
- Additional trailer parking area: 80 spaces / 12' x 55'
- 6 electric vehicle charging stations per building
- Building depth: 260'
- ESFR sprinklers
- LED lighting
Details
Location
30 Lafferty Lane
Dover, DE 19901
Driving Directions
Contact / Leasing
JP Matan
(301) 815-9985 (direct)
jpmatan@mataninc.com
Additional Info
Status: Planned
Size: 296,400 SF / 29.60 acres
Downloads
Share ThisTwitterFacebookLinkedInEmailCopy Link
Share